Transition notes:
- Put away all the Torsion Pendulum parts.
- The “A” base, 90 cm rod, mass set, and the RMS will be used in this lab.
- The RMS pulley with the string attached is to be stored in the bin for RMS with string.
Equipment list:
- Pasco 750 Lab interface with the following sensors:
- RMS (C3.1) on 90 cm rod in “A” base (C20.1) (yellow DG1, black DG2)
- Pressure sensor, CI-6534A (Analog A) (C11.1) with 8 pin DIN cable (C11.H)
- Two temperature sensors (C10.H) on two 90° clamps (A1)
(steam generator to Analog B and Cup to Analog C)
- Heat Engine (C11.1). See the setup notes for details on how to assemble this.
- Small aluminum can
- Two pieces of Tygon tubing
- ~30 cm, 2 quick connect couplers, attaches pressure sensor to heat engine (Activity 1).
- ~50 cm quick connect coupler/ barbed coupler into a one-hole #8 stopper (Activity 5).
- String attached to platform and going around the large pulley of the rotary motion sensor
- 45 cm rod (A1) mounted with a 90° clamp (C10.3) to the 90 cm steel rod in “A” base.
- Mass set (1-10, 2-20, 2-50,1-100, 2-200, 1-500 gram) (C10.1)
- 5 gram mass hanger (C10.2)
- Steam generator (C11.1) with power cable (C9.H)
- One large Styrofoam cup (C11.3)
- Small metric ruler (C10.2)
- Plastic cup for filling steam generator (C11.3)
General Class use items:
- 5 gallon container of de-ionized water (one per quadrant) (A3.2)
- Cooler with ice (one per quadrant) (A3.1)
- Hyman “fire piston” with lubricant, treated paper, cotton, and one 30 cm ruler per piston (C11.3)
(3 per quadrant)
Notes and Tests:
- Test that the RMS reads positve when the engine piston is moved up and that the temperature probes have good readings with the test file “2305_Lab12_Thermal_test.ds”
- Both tubing clamps on Heat Engine should be open.
- Set up the RMS at the very top of the 90cm rod so the mass hanger can move freely.
|


|