* Roger Carlini (9/10/04): Roger's summary of 9/9/04 meeting with outline of future plans.
* Roger Carlini (9/10/04): Roger's suggestions about main detector construction based on input from Peter Bosted.
* Dave Mack (9/10/04) with attachment: Dave's calculations about Roger's suggestion and comments on a calorimater option.
* Dave Mack (9/13/04) with attachment: Dave's comments of the sensitivity of Q2 determination to longitudinal alignment tolerances.
* Roger Carlini (9/14/04): Roger's response to my request to leave the "modified Boston collimator" on the table a little longer.
* Greg Smith (9/15/04): Greg's comments about "modified Boston Collimator" versus downstream collimator.
* Jim Birchall (9/15/04): Jim's comments about "modified Boston Collimator" versus downstream collimator.
* Neven Simicevic (9/15/04): Neven's comments about "modified Boston Collimator" versus downstream collimator.
* Dave Mack (9/15/04): Dave's comments about "modified Boston Collimator" versus downstream collimator.
* Jim Birchall (9/17/04) (with plots): Jim's results for elastic/inelastic separation and Q2 distribution of 10-8-22 Boston Collimator
* Yongguang Liang (9/17/04): Yongguang's simulation of the 10-8-22 Boston Collimator..
* Jim Birchall (9/17/04): Jim's comments on Yongguang's simulation
* Yongguang Liang (9/17/04): Yongguang's response to Jim.
* Tony Forest (9/16/04): Tony's study of momentum distribution plots with and without radiative corrections turned on.
* Mark Pitt (9/20/04): Announcement of next meeting and partial summary of the 9/17/04 meeting.