Archive of Materials from Primary Collimator Working Group
for 9/10/04 - 9/17/04


* Roger Carlini (9/10/04): Roger's summary of 9/9/04 meeting with outline of future plans.

* Roger Carlini (9/10/04): Roger's suggestions about main detector construction based on input from Peter Bosted.

* Dave Mack (9/10/04) with attachment: Dave's calculations about Roger's suggestion and comments on a calorimater option.

* Dave Mack (9/13/04) with attachment: Dave's comments of the sensitivity of Q2 determination to longitudinal alignment tolerances.

* Roger Carlini (9/14/04): Roger's response to my request to leave the "modified Boston collimator" on the table a little longer.

* Greg Smith (9/15/04): Greg's comments about "modified Boston Collimator" versus downstream collimator.

* Jim Birchall (9/15/04): Jim's comments about "modified Boston Collimator" versus downstream collimator.

* Neven Simicevic (9/15/04): Neven's comments about "modified Boston Collimator" versus downstream collimator.

* Dave Mack (9/15/04): Dave's comments about "modified Boston Collimator" versus downstream collimator.

* Jim Birchall (9/17/04) (with plots): Jim's results for elastic/inelastic separation and Q2 distribution of 10-8-22 Boston Collimator

* Yongguang Liang (9/17/04): Yongguang's simulation of the 10-8-22 Boston Collimator..

* Jim Birchall (9/17/04): Jim's comments on Yongguang's simulation

* Yongguang Liang (9/17/04): Yongguang's response to Jim.

* Tony Forest (9/16/04): Tony's study of momentum distribution plots with and without radiative corrections turned on.

* Mark Pitt (9/20/04): Announcement of next meeting and partial summary of the 9/17/04 meeting.